FAQ & Advanced Scenarios
General Inventory Questions
Who can create inventories?
Only users with Administrator permissions can create inventories. Assigned users can participate in scanning but cannot create new inventories.
How many inventories can be active at once?
There is no limit to active inventories. You can run inventories at multiple sites simultaneously. However, consider administrator processing capacity - managing 5+ active inventories concurrently may become overwhelming.
Can I run multiple inventories at the same site?
Yes, but coordinate carefully. For example, you might run:
- IT Equipment inventory (one team)
- Furniture inventory (different team)
- Both covering same site but different asset categories
Caution: Ensure scopes don't overlap (same asset scanned in both) to avoid confusion.
Can I reopen a completed inventory?
No, completed inventories are final and cannot be reopened. If you need to make corrections:
- Update asset records directly in Asset Management
- Create a new inventory if extensive re-verification needed
- Export results and manually correct data
Best practice: Thoroughly review before marking complete (action is irreversible).
What happens to blind links when inventory is completed?
Blind links automatically expire when inventory status changes to Completed or Cancelled. Users clicking expired links see "Inventory no longer accepting submissions" message.
How long should I keep inventory results?
Retention depends on your industry and compliance requirements:
- Financial audits: 7 years typical
- Compliance audits: 5 years typical
- Internal records: 3 years minimum
- Check regulations: HIPAA, SOX, or industry-specific requirements
Recommendation: Export reports immediately upon completion and store in multiple locations (system + file server + offline backup).
User Management Questions
Can one person be assigned to multiple inventories?
Yes, users can be assigned to as many inventories as needed. Their dashboard shows all assigned inventories. Useful for:
- Multi-site managers overseeing several locations
- Facilities staff covering multiple buildings
- Central IT team managing equipment across sites
Can external users (blind link) log in to ARMOR?
No, blind link users have no portal access. They:
- Click unique URL (token-based authentication)
- Scan assets via browser interface
- Cannot see database, progress, or results
- Cannot log in to ARMOR platform
How do I know if users are actively scanning?
For standard inventory (assigned users):
- Green dot indicator = submitted in last 10 minutes
- Gray dot = inactive
- Last activity timestamp shows exact time
- Submission count per user
For blind inventory (external users):
- Aggregate only: "12 active users in last hour"
- No individual identification (privacy by design)
- Total submission count updates in real-time
Can I revoke blind link access for specific people?
Not individually - blind links are shared tokens (not personalized). To revoke:
- Complete inventory: Expires link for everyone
- Change to Draft status: Temporarily disables submissions
- Cancel inventory: Permanently expires link
There is no way to block one person while allowing others with same link.
Processing & Workflow Questions
What is "pending" vs. "flagged"?
| Status | Meaning | Resolution |
|---|---|---|
| Pending | Awaiting approval, minor info completion needed | Quick decisions, minimal research, bulk approval possible |
| Flagged | Requires investigation, administrator decision | Research required, individual attention, may need field verification |
Do flagged submissions count toward progress?
No, only Verified submissions count toward progress percentage. Pending, Flagged, and Rejected submissions do not count. This means:
- 500 submissions received
- 400 verified = 80% progress (if 500 expected)
- 75 pending + 25 flagged = not counted yet
Action: Resolve pending/flagged queues to increase progress percentage.
Can I complete inventory below 100%?
Yes, you can complete inventory at any percentage. 100% is ideal but not always realistic:
- 95-100%: Excellent completion
- 85-94%: Good, acceptable for most purposes
- 70-84%: Fair, document exceptions
- <70%: Investigate issues before completing
Best practice: Document why assets are missing (transferred, disposed, stolen, etc.) rather than leaving unexplained gaps.
What's the difference between Match Tab and Review & Process Tab?
| Match Tab | Review & Process Tab |
|---|---|
| Reconcile submissions to database | Verify accuracy and approve for completion |
| Confidence scoring (High/Medium/Low) | Status categories (Verified/Flagged/Pending/Rejected) |
| Automatic matching, duplicates, new assets | Quality control checkpoint, flag resolution |
| First processing step | Second processing step (after Match) |
Workflow: Match → Review & Process → Results
Progress & Due Date Questions
How is progress calculated?
Progress % = (Verified Assets / Expected Assets) × 100%
Example:
- Expected: 500 assets
- Verified: 475 assets
- Progress: (475 / 500) × 100 = 95%
Can exceed 100%: If new assets discovered (e.g., 500 expected, 520 verified = 104%)
Is the due date enforced?
No, the due date is informational only - not a hard cutoff. You can:
- Continue collecting submissions after due date
- Process results at your own pace
- Complete inventory whenever ready
Purpose of due date: Goal-setting for team, urgency indicator, planning tool. System does not automatically close inventory on due date.
Can I change the due date after inventory starts?
Yes, edit inventory and update due date anytime before completion. Useful when:
- Progress slower than expected
- More time needed for processing
- Team availability changes
Recommendation: Communicate new due date to team if extended.
Why did progress go down?
Progress can decrease if:
- Verified assets rejected: Administrator un-approves submissions
- Expected assets increased: Database updated to include more assets at site
- Duplicates removed: Multiple verifications of same asset collapsed to one
Usually: Progress only increases. Decreases are rare and indicate data corrections.
Technical Questions
What browsers are supported?
Recommended (current versions):
- Chrome (desktop and mobile)
- Microsoft Edge (desktop and mobile)
- Safari (desktop and mobile - iOS 14+)
- Firefox (desktop)
Not supported: Internet Explorer, very old browser versions
Does scanning work offline?
Generally no - ARMOR requires internet connection for real-time submission. However:
- Some mobile devices may queue submissions briefly if connection drops
- Check if offline mode feature available in your deployment
- WiFi recommended over cellular for stability
Where is inventory data stored?
Data is stored in ARMOR cloud infrastructure with:
- Encryption in transit (HTTPS)
- Encryption at rest
- Regular backups
- Data residency compliance (check with your administrator for specific region)
Can I access inventory via API?
Depends on deployment. Some organizations have API access for:
- Automated reporting
- Integration with CMDB/ERP systems
- Custom dashboards
Contact support to inquire about API availability and documentation.
Can I integrate inventory with other systems?
Typical integrations:
- Asset Management: Import verified assets to update database
- CMDB: Sync configuration items
- Financial systems: Update depreciation schedules
- Reporting tools: Export to Power BI, Tableau, etc.
Method: Usually via CSV export or API (if available).
Advanced Scenarios
Scenario: Multi-Site Organization with 20+ Locations
Challenge: Conduct annual inventory across all sites efficiently
Strategy:
- Stagger timelines: 5 sites per quarter (avoid overwhelming central processing team)
- Designate site coordinators: Local point of contact at each location
- Standardized templates: Reusable instructions, QR codes, training materials
- Central processing team: 2-3 administrators process all sites (consistency)
- Dashboard monitoring: Track progress across all active inventories
- Quarterly reports: Roll up completion rates, findings, trends
Outcome: Manageable workload, consistent process, year-round fresh data
Scenario: One-Time Compliance Audit by External Firm
Challenge: External auditor needs to verify assets independently without ARMOR access
Strategy:
- Create blind inventory: Auditor cannot see database (independence)
- Email blind link: Send to audit lead with detailed instructions
- Audit firm uses their staff: No ARMOR accounts needed
- Administrator processes: Match/Review submissions after collection
- Export compliance report: PDF with audit trail, findings, exceptions
- Share results: Provide auditor with completion report
Outcome: Auditor independence maintained, secure access, comprehensive documentation
Scenario: Recurring Quarterly IT Asset Verification
Challenge: IT department needs lightweight checks every quarter (not full inventory)
Strategy:
- Filter scope: Only IT assets over $1,000
- Standard inventory: Assign IT staff (5-7 people)
- Short timeline: 1 week collection, 2 days processing
- Template reuse: Copy previous quarter's setup
- Focus on changes: Flag any moved/damaged/missing items
- Quick turnaround: Results within 10 days
Outcome: Continuous IT asset health monitoring, minimal disruption, trend tracking
Scenario: Newly Acquired Building with Unknown Assets
Challenge: Company acquired facility - need to catalog everything from scratch
Strategy:
- Blind inventory ideal: No expected assets (discovery mode)
- Large team: 10-20 contractors for fast completion
- Comprehensive scope: "Scan everything with a barcode or serial number"
- Photograph everything: Visual documentation critical
- Manual entry expected: Many untagged items
- Administrator creates database records: Each submission builds new asset
- Generate asset tags post-inventory: Label everything after cataloged
Outcome: Comprehensive asset database from zero, foundation for ongoing management
Scenario: High-Security Data Center with Access Restrictions
Challenge: Only authorized personnel can enter, can't use large team
Strategy:
- Standard inventory: 2-3 authorized IT staff assigned
- Slow pace acceptable: Precision over speed (2-3 weeks collection)
- Serial number focus: Rack servers, network equipment (manufacturer serial)
- Scheduled access: Coordinate with security, backup windows
- Photograph rack layouts: Visual blade server positions
- Cross-verify high-value: Double-check $10K+ equipment
- Meticulous notes: Rack number, slot, cabling info
Outcome: Accurate data center inventory without compromising security
Scenario: Phased Implementation for Very Large Organization
Challenge: 100,000+ assets across 50 sites - can't do all at once
Strategy:
- Phase 1 (Pilot): 2-3 sites, test process, refine approach
- Phase 2 (Early Adopters): 10 sites, train site coordinators
- Phase 3 (Majority): 30 sites, batch processing, standardized templates
- Phase 4 (Stragglers): Remaining 7 sites, lessons learned applied
- Timeline: 12-18 months total project
- Central team: 5-7 administrators process in waves
- Technology: API integration for bulk database updates
Outcome: Manageable rollout, continuous improvement, eventual complete asset visibility
What's Next?
- Common Issues & Solutions - Troubleshooting guide
- Best Practices for Inventory Success - Proven strategies
- Introduction to Inventory Management - Getting started basics
Getting Help
For questions not answered here, contact the ARMOR Support Team or search the knowledge base for additional articles.
Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article